West Chester University Pump House Geothermal Phase II
Owner: West Chester University
Location: Chester County, PA
Completed: 2013

The work of this project included providing the material, labor, equipment, and services for the North Campus District Geothermal Phase II – Pump House. The job consisted of connection of existing geothermal well field piping to the pump house and the installation of new geothermal piping. Variable flow vertical inline centrifugal pumps were installed to serve the main campus geothermal heat loop water distribution system and distribute through existing and future closed loop geothermal well fields.